turbodave_98
TurboDave_98
Thanks to all that have so far responded to the call for the ride. Looks like a simple majority wants to do it prior to WFO-5. The appx. 2500 mile run starting near South Lake Tahoe CA will take about 5 easy days of riding. For specific dates I suggest departing on Saturday 22 July at 0800 and end the ride on 26 July at the Hilton in Reno. There is a map and ride plan posted by Skyway(thanks Buddy), above date 19 Feb at 04:45pm.
Request another [SIZE=14pt]headcount on possible riders by 30 March 2006.[/SIZE]
Thanks
Request another [SIZE=14pt]headcount on possible riders by 30 March 2006.[/SIZE]
Thanks