Chief Joseph Scenic Highway, Paint Creek Canyon & Two Dot Sections

Yamaha FJR Motorcycle Forum

Help Support Yamaha FJR Motorcycle Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

bigjohnsd

2021 BMW R1250GSA
Joined
Mar 2, 2014
Messages
2,733
Reaction score
2,079
Location
Spearfish SD
Chief Joseph Scenic Highway, Paint Creek Canyon & Two Dot Sections

Project Number: STP 35.58-DR51574 & SCP-TC 33.20 1507036_

WYDOT Contact: Todd Frost, phone: 307-587-2220, email: [email protected]

Contractor: Oftedal Construction, Inc., Miles City, MT, 406-232-5911

Scheduled Completion Date: 2017-Jun-30

Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal, bridge deck repair and miscellaneous work on 13.32 miles of WYO 296 begiining at RM 46.20 on Chief Joseph Scenic Highway. Expect up to 20-minute delays with stopped conditions.

Road

Milepost(s)

Surface

Delays and Scheduled Closures

WY296

33.2 to 46.2

Paved

20 minute delays with stopped conditions
Last Updated: 2016-06-15 13:39:58.837

 
Sounds like the same crap we ran into last year John.........really took a LOT of the fun out of that part of the ride!
fool.gif
fool.gif


 
Top