?? So all of you are just gonna bend over and smile like you like it?? :blink:
Can't anyone(s) from this board - from Cali. -especially his friends- visit Ian, and assist in mediating this so our friends don't get stuck with this through no fault of their own?
This is a good idea but I think we need a more united front with specific demands. We've been down this path of Ian saying that it will be here "soon" too long.
What I propose is that who ever we can find to contact Ian spell out a specific date we need this wrapped up by and the if not we require a full refund. I don't have a list of everyone who's in on the group buy but I hope most if not all will be following this thread.
Has anyone found a reliable means to contact Ian? If we can't find a person local to Ian maybe a registered letter will break through? I propose that we give him 60 days after we're able to make contact. So if we got in touch with him in the next few days that would be about June 1st.
Whata ya think?
If I recall correctly TurboDave is the only one who has a GENII kit which he supposedly received gratis for providing his bike during the design stage. Does anyone know him ? He might be able to provide some information and assistance.
Turbodave does have the only GENII setup on his bike, although it is not what I would call a final design. It was only ever intended for him as a trial unit to see if the concept and placement of the cell would be suitable. All the feedback I've recieved so far indicates that it has worked without fault.
I am about to wrap up a large project that is holding up the completion of the fuel cells. I now have an extra pair of hands helping me out (which is
really helping me out!) and I'm in talks with another machinist at this time. Though we're only a small company, we are in the midst of growth. Everyone will be getting what I promissed them and that time is now near.
While I have been able to keep up shipping out all of the orders that are coming through my website, (and they are coming from around the world in numbers that are shocking me) I have not given this venture near enough the attention it deserves and for this I'm very sorry for the frustrations that are being caused. In the coming quarter of this year, this is all going to change. To start, there will be at least 3 others coming on board to ramp this whole thing up and start filling all the bike catagories that have been sitting empty. We will be adding a variety of new products that are designed and tested and have not yet been released. We are also in negotiations to obtain a larger facility to be custom build for our needs. All of which will begin once the fuel cells have been shipped out.
None of the above is intended to be an excuse for my not shipping product, but it is where I'm at right now. I am meeting some forum members today for lunch and it will be a welcomed sight, as I miss getting out and about to meet good people.
I know I've not been around the forum for quite some time, but once I get caught up I'll check back in on a regular basis and hopefully try to contribute something usefull for folks. I've met and keep in touch with a lot of good people on this forum, that for sure without it, our paths would never have crossed. (All except for SkooterG, I've regretted meeting that desert rat from the moment I laid eyes on him)